Welcome to the new Heckler website. Need help or want to share feedback? Use chat or the Feedback tab.

Skip to guide content
H807

Video Meeting Hub for Heckler AV Wall

Install the AV Wall Hub brackets, shelf, device panel, camera, and enclosure panels.
H807 hub with a video bar and front enclosure installed below a single display on AV Wall posts.

This guide is also available as a printable PDF.

In the box

  1. 1 x Front Panel
  2. 1 x Shelf
  3. 1 x Device Panel
  4. 2 x Side Cover
Exploded included-parts drawing labeled a–d: front panel, shelf, device panel, and two side covers.
  1. 1 x Bottom bracket set
  2. 1 x Top bracket set
  3. 1 x Hex Key
  4. 4 x Quick-release pin
  5. 8 x Rack-mounting screw
  6. 1 x Velcro
Included hardware labeled e–j: bottom and top bracket sets, hex key, quick-release pins, rack-mounting screws, and coiled hook-and-loop material.
  • Tape measure
  • Level
  • Masking tape

Install top bracket set

Based on your desired camera lens height, and the distance between the lens and the shelf, determine the desired mounting height of the shelf.

Use masking tape to mark the shelf height.

Shelf height marked horizontally across the AV Wall uprights beneath the outlined camera.

Hook the left bracket and right bracket into the AV Wall structure as shown.

Four close-ups showing the left top bracket hooked into the upright and lowered into position.
Rear close-ups showing the top bracket hooks engaging the upright openings.
Two installed top brackets at the marked height, with quick-release pin locations indicated.

Verify the left and right brackets are at the same height.

Dashed horizontal reference connecting the top brackets to show equal height.

Loosen the mounting screw.

Hex key at the left top bracket mounting screw, with a curved loosening arrow.

Repeat on the right bracket.

Hex key at the right top bracket mounting screw.

Install shelf

Lower the shelf onto the top brackets as shown.

Shelf aligned above the two top brackets.
Shelf resting on the brackets, with its two mounting positions circled.
Four close-ups showing shelf keyholes engaging the screw heads and the screws tightened with a hex key.

Tighten the mounting screws.

Shelf secured to the two top brackets.

Install bottom bracket set

Lower bracket positions circled on the AV Wall uprights beneath the shelf.

Using masking tape, mark a location 20 3/8 inches below the bottom edge of the shelf.

Bottom bracket height shown as 20 3/8 inches below the shelf’s bottom edge.
Close-up of the bottom bracket position and the 20 3/8-inch reference from the shelf.
Four close-ups showing a bottom bracket hooked into the upright and lowered into position.
Rear close-ups showing bottom bracket hooks engaging the upright openings.
Installed bottom brackets with quick-release pins shown at their locking positions.

Verify the left and right brackets are at the same height.

Dashed horizontal reference connecting the bottom brackets to show equal height.

Install device panel

Devices and cables strapped to the perforated device panel.
Two device-panel mounting screws beneath the shelf circled.

Slightly loosen the two Device Panel mounting screws.

Hex key loosening a device-panel mounting screw.

Hang the Device Panel on the mounting screws as shown.

Tighten the mounting screws.

Loaded device panel hanging beneath the shelf on its mounting screws.
Four close-ups showing device-panel keyholes engaging the screws and the screws tightened with a hex key.

Install rackmount devices (optional)

Remove the side panel thumbscrews.

Close-ups of the side-panel thumbscrews removed from the upper and lower brackets.

Fasten the component in place using the rack-mounting screws provided or your favorite 10-32 rack-mounting screws.

Optional rack-mount component positioned vertically between the left brackets with its mounting screws.

Install side panels

Install the side panel as shown with the provided thumbscrews.

Side cover fastened to the upper and lower brackets with thumbscrews.

Install camera

Rest your camera on the shelf using your camera’s table stand.

Video bar resting on its table stand on the shelf.
Camera-stand mounting hole shown from beneath the shelf.

Install front panel

Carefully lower the ball joints on the rear of the panel into the bottom brackets as shown.

Front panel tilted and lowered toward the two bottom brackets.
Close-up showing a rear ball joint aligned with the bottom bracket opening.
Ball joint seated in the bottom bracket.

Push the panel toward the shelf until the magnets engage. The upper edge of your panel should be positioned directly below the front edge of the shelf.

Front panel rotating upward toward the magnetic attachment below the shelf.
Completed AV Wall with display, camera on the shelf, and front panel beneath it.